View SchemaTowards Reliable Acceleration of High-energy and High-intensity Electron Beams
| Authors | K. Furukawa, Linac Commissioning Group |
|---|---|
| Categories | |
| ArXiv ID | physics/0008129 |
| URL | https://arxiv.org/abs/physics/0008129 |
| Journal | eConf C000821 (2000) TUE09 |
Abstract
KEK electron linac was upgraded to 8 GeV for the KEK B-Factory (KEKB) project. During the commissioning of the upgraded linac, even continuing SOR ring injections, we had achieved a primary electron beam with 10-nC (6.24 x 10^10) per bunch up to 3.7-GeV for positron generation. This could be classified as one of the brightest S-band linac's. Since the KEKB rings were completed in December 1998, those 3.5-GeV position and 8-GeV electron beams have been injected with an excellent performance. Moreover, we have succeeded in switching among the high-intensity beams for KEKB and beams for two SOR rings with sufficient reproducibility. After the commissioning of the KEKB ring started, we have launched a project to stabilize the intensity and quality of the high-current beams furthermore, and have accomplished it investigating every conceivable aspect.
{
"annotation_id": "fdeaeaa3-f8b6-4c6f-a7f3-5eb5e2b9125f",
"date_created": "2026-03-02T18:00:32.727000Z",
"date_modified": "2026-03-02T18:00:32.727000Z",
"file_hash": "775c91cfa2e5015466bee9c02669842b8951a8248760bbdefcd5e0a1730b92cc",
"private": false,
"record": {
"abstract": "KEK electron linac was upgraded to 8 GeV for the KEK B-Factory (KEKB)\nproject. During the commissioning of the upgraded linac, even continuing SOR\nring injections, we had achieved a primary electron beam with 10-nC (6.24 x\n10^10) per bunch up to 3.7-GeV for positron generation. This could be\nclassified as one of the brightest S-band linac\u0027s.\n Since the KEKB rings were completed in December 1998, those 3.5-GeV position\nand 8-GeV electron beams have been injected with an excellent performance.\nMoreover, we have succeeded in switching among the high-intensity beams for\nKEKB and beams for two SOR rings with sufficient reproducibility.\n After the commissioning of the KEKB ring started, we have launched a project\nto stabilize the intensity and quality of the high-current beams furthermore,\nand have accomplished it investigating every conceivable aspect.",
"arxiv_id": "physics/0008129",
"authors": [
"K. Furukawa",
"Linac Commissioning Group"
],
"categories": [
"physics.acc-ph"
],
"journal_ref": "eConf C000821 (2000) TUE09",
"title": "Towards Reliable Acceleration of High-energy and High-intensity Electron Beams",
"url": "https://arxiv.org/abs/physics/0008129"
},
"schema_id": "dorsal/arxiv",
"source": {
"execution_id": "54938b53-7bb5-40ff-a341-3cc125ccab2b",
"id": "arXiv Dataset IDs",
"type": "Model",
"variant": "snapshot-2026-03-01",
"version": "0.1.0"
},
"user_id": 1000002
}