dorsal/arxiv
View SchemaComparisons Between Modeling and Measured Performance of the BNL Linac
| Authors | D. Raparia, J. G. Alessi, A. Kponou |
|---|---|
| Categories | |
| ArXiv ID | physics/9612016 |
| URL | https://arxiv.org/abs/physics/9612016 |
| Journal | Conf.Proc.C9608262:779-781,1996 |
Abstract
Quite good agreement has been achieved between computer modeling and actual performance of the Brookhaven 200 MeV Linac. We will present comparisons between calculated and measured performance for the beam transport through the RFQ, the 6 meter transport from RFQ to the linac and meching and transport through the linac.
{
"annotation_id": "f3feb484-226c-496e-a197-e78901447447",
"date_created": "2026-03-02T18:01:17.807000Z",
"date_modified": "2026-03-02T18:01:17.807000Z",
"file_hash": "d9270e34bad9973787dc5fab37fae11508bb6fac2d0fab7a5506a0125a3a2949",
"private": false,
"record": {
"abstract": "Quite good agreement has been achieved between computer modeling and actual\nperformance of the Brookhaven 200 MeV Linac. We will present comparisons\nbetween calculated and measured performance for the beam transport through the\nRFQ, the 6 meter transport from RFQ to the linac and meching and transport\nthrough the linac.",
"arxiv_id": "physics/9612016",
"authors": [
"D. Raparia",
"J. G. Alessi",
"A. Kponou"
],
"categories": [
"physics.acc-ph"
],
"journal_ref": "Conf.Proc.C9608262:779-781,1996",
"title": "Comparisons Between Modeling and Measured Performance of the BNL Linac",
"url": "https://arxiv.org/abs/physics/9612016"
},
"schema_id": "dorsal/arxiv",
"source": {
"execution_id": "017b3066-557a-4bcd-b9c7-643681858c29",
"id": "arXiv Dataset IDs",
"type": "Model",
"variant": "snapshot-2026-03-01",
"version": "0.1.0"
},
"user_id": 1000002
}