dorsal/arxiv
View SchemaA Control System of the Joint-Project Accelerator Complex
| Authors | J. Chiba, H. Fujii, K. Furukawa, N. Kamikubota, H. Nakagawa, N. Yamamoto, H. Sakaki, H. Yoshikawa |
|---|---|
| Categories | |
| ArXiv ID | physics/0111202 |
| URL | https://arxiv.org/abs/physics/0111202 |
| Journal | eConf C011127 (2001) TUAP002 |
Abstract
The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the Joint-Project has been approved and recently started its construction at JAERI site at Tokai. The first beam commissioning is scheduled in 2006. In parallel with it, a 60-MeV Linac is now being constructed at KEK site at Tsukuba for R&D purpose. Recently the Project has officially decided to use the Experimental Physics and Industrial Control System (EPICS). Under the EPICS environment, we are challenging to implement the Ethernet/IP network for all communication, even at the level of end-point controllers which are so far connected via a field bus. In order to realize such a system, three new controllers (PLCs, WE7000 stations and general-purpose Ethernet boards) are being developed. A prototype EPICS driver for the PLCs works fine and is used to control the ion-source at the KEK Linac.
{
"annotation_id": "59918470-e601-4814-9009-be29ba813122",
"date_created": "2026-03-02T18:00:36.464000Z",
"date_modified": "2026-03-02T18:00:36.464000Z",
"file_hash": "61734a05e327af8687e1d20a1e8538d28962ef0ce9b391989b96ef783007a281",
"private": false,
"record": {
"abstract": "The current status of the control system for a new high intensity proton\naccelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the\nJoint-Project has been approved and recently started its construction at JAERI\nsite at Tokai. The first beam commissioning is scheduled in 2006. In parallel\nwith it, a 60-MeV Linac is now being constructed at KEK site at Tsukuba for R\u0026D\npurpose. Recently the Project has officially decided to use the Experimental\nPhysics and Industrial Control System (EPICS). Under the EPICS environment, we\nare challenging to implement the Ethernet/IP network for all communication,\neven at the level of end-point controllers which are so far connected via a\nfield bus. In order to realize such a system, three new controllers (PLCs,\nWE7000 stations and general-purpose Ethernet boards) are being developed. A\nprototype EPICS driver for the PLCs works fine and is used to control the\nion-source at the KEK Linac.",
"arxiv_id": "physics/0111202",
"authors": [
"J. Chiba",
"H. Fujii",
"K. Furukawa",
"N. Kamikubota",
"H. Nakagawa",
"N. Yamamoto",
"H. Sakaki",
"H. Yoshikawa"
],
"categories": [
"physics.acc-ph"
],
"journal_ref": "eConf C011127 (2001) TUAP002",
"title": "A Control System of the Joint-Project Accelerator Complex",
"url": "https://arxiv.org/abs/physics/0111202"
},
"schema_id": "dorsal/arxiv",
"source": {
"execution_id": "f400fb1d-1e75-497f-b65b-86a8b0521e53",
"id": "arXiv Dataset IDs",
"type": "Model",
"variant": "snapshot-2026-03-01",
"version": "0.1.0"
},
"user_id": 1000002
}