dorsal/arxiv
View SchemaUpgrade of Linac Control System with New Vme Controllers at Spring-8
| Authors | T. Masuda, T. Ohata, T. Asaka, H. Dewa, T. Fukui, H. Hanaki, N. Hosoda, T. Kobayashi, M. Kodera, A. Mizuno, S. Nakajima, S. Suzuki, M. Takao, R. Tanaka, T. Taniuchi, Y. Taniuchi, H. Tomizawa, A. Yamashita, K. Yanagida |
|---|---|
| Categories | |
| ArXiv ID | physics/0111131 |
| URL | https://arxiv.org/abs/physics/0111131 |
| Journal | eConf C011127 (2001) WEAT005 |
Abstract
We integrated an injector linac control system to the SPring-8 standard system on September 2000. As a result of this integration, the SPring-8 accelerator complex was controlled by one unified system. Because the linac was continuously running as the electron beam injector not only for the SPring-8 storage ring but also for New SUBARU, we had to minimize the hardware modification to reduce the time for the development and testing of the new control system. The integration method was almost the same as that of the integration of the booster synchrotron. We report here on the integration of the linac control system with emphasis on the upgrade of the VMEbus controllers and software involving the operating system Solaris 7 as the real-time OS.
{
"annotation_id": "481094f8-0f19-4db8-bbfd-6611830c375c",
"date_created": "2026-03-02T18:00:36.335000Z",
"date_modified": "2026-03-02T18:00:36.335000Z",
"file_hash": "e6111175f2755fbd027dbf72223b790478406a26aadad3999d8660165e89465d",
"private": false,
"record": {
"abstract": "We integrated an injector linac control system to the SPring-8 standard\nsystem on September 2000. As a result of this integration, the SPring-8\naccelerator complex was controlled by one unified system. Because the linac was\ncontinuously running as the electron beam injector not only for the SPring-8\nstorage ring but also for New SUBARU, we had to minimize the hardware\nmodification to reduce the time for the development and testing of the new\ncontrol system. The integration method was almost the same as that of the\nintegration of the booster synchrotron. We report here on the integration of\nthe linac control system with emphasis on the upgrade of the VMEbus controllers\nand software involving the operating system Solaris 7 as the real-time OS.",
"arxiv_id": "physics/0111131",
"authors": [
"T. Masuda",
"T. Ohata",
"T. Asaka",
"H. Dewa",
"T. Fukui",
"H. Hanaki",
"N. Hosoda",
"T. Kobayashi",
"M. Kodera",
"A. Mizuno",
"S. Nakajima",
"S. Suzuki",
"M. Takao",
"R. Tanaka",
"T. Taniuchi",
"Y. Taniuchi",
"H. Tomizawa",
"A. Yamashita",
"K. Yanagida"
],
"categories": [
"physics.acc-ph"
],
"journal_ref": "eConf C011127 (2001) WEAT005",
"title": "Upgrade of Linac Control System with New Vme Controllers at Spring-8",
"url": "https://arxiv.org/abs/physics/0111131"
},
"schema_id": "dorsal/arxiv",
"source": {
"execution_id": "fe62f8c0-169f-4742-8ed1-f6d62c1cea43",
"id": "arXiv Dataset IDs",
"type": "Model",
"variant": "snapshot-2026-03-01",
"version": "0.1.0"
},
"user_id": 1000002
}